2015 Series Pergola Assembly | Fast Outdoor Shade Setup

Description

Required Tools:

1,Gloves

2,Hammer

3,Safety Helmet

4,Tape Measure

5,Electric Drill

6,Ladder

7,Balance Meter

8,Balance Ruler

Installation Requirements:

(1) Use a level to check if the construction site is flat.

(2) If there is a height difference on the ground, the drop should be controlled to be less than or equal to 1 cm.

Note: Ensure that the heights of ABCD are consistent, and that the E Surface is on the same plane.

Assembling the side beams:

first position the side beam and base plate for easy installation.

After positioning, first install the front and side beams. The installation steps are as follows:

1,Remove the base plate from the upright.

2,Slide the side beams into the base plate one by one.

3,Install the bow-shaped angle brackets.

Note: When sliding in the side beams, remember to insert the L-shaped angle brackets.

Fixing the side beams and columns:

4,Push the left and right side beams tightly together to eliminate any gaps, then tighten the screws.,

5,Screws must be driven into the L-shaped brackets at a 45-degree angle.

6,Route the motor wires and main light wires properly.

7,Ensure the columns are oriented correctly, secure the base plate screws to the columns, and verify the wiring is correct.

Installing the drainage gutter:

4

The following are the steps for installing the drainage gutter:

  1. First install the side with louver holes, then install the side without louver holes.
  2. Note: Align the grooves and hang the gutter.
  3. After hanging the gutter, tighten the screws to secure it in place.

Wiring and gluing:

10,The following is a diagram of the wiring:5

11,The following is a diagram of the glue distribution:

Installing Venetian blind slats:

Install the push rod:

Install and lock all blades:

Blade connection:

Install the motor:

Install the column cover:

Power on and debug: